bird_inventory_thiestouba_senegal

Occurrence Observation
Latest version published by ARTELIA on Mar 11, 2026 ARTELIA
Publication date:
11 March 2026
Published by:
ARTELIA
License:
CC-BY 4.0

Download the latest version of this resource data as a Darwin Core Archive (DwC-A) or the resource metadata as EML or RTF:

Data as a DwC-A file download 511 records in English (14 KB) - Update frequency: as needed
Metadata as an EML file download in English (11 KB)
Metadata as an RTF file download in English (9 KB)

Description

The database was developed as part of an Environmental and Social Impact Assessment (ESIA) conducted in accordance with IFC Performance Standards for a solar power plant project implemented on two distinct sites in Senegal. The project is led by SENELEC and supported by the French Development Agency (AFD). The database compiles avifaunal survey data, including the date and location of each observation, the species identified along with its taxonomic information, the observation method used, and a description of the surrounding environment. Species identification was carried out by a local ornithologist and underwent a quality‑control process to ensure accuracy.

Data Records

The data in this occurrence resource has been published as a Darwin Core Archive (DwC-A), which is a standardized format for sharing biodiversity data as a set of one or more data tables. The core data table contains 511 records.

This IPT archives the data and thus serves as the data repository. The data and resource metadata are available for download in the downloads section. The versions table lists other versions of the resource that have been made publicly available and allows tracking changes made to the resource over time.

Versions

The table below shows only published versions of the resource that are publicly accessible.

How to cite

Researchers should cite this work as follows:

Seye S M, Lerquet M (2026). bird_inventory_thiestouba_senegal. Version 1.0. ARTELIA. Occurrence dataset. https://ipt.gbif.fr/resource?r=bird_inventory_thiestouba_senegal&v=1.0

Rights

Researchers should respect the following rights statement:

The publisher and rights holder of this work is ARTELIA. This work is licensed under a Creative Commons Attribution (CC-BY 4.0) License.

GBIF Registration

This resource has been registered with GBIF, and assigned the following GBIF UUID: 081fc123-1a65-4d0f-a9a0-a53c939d6727.  ARTELIA publishes this resource, and is itself registered in GBIF as a data publisher endorsed by GBIF France.

Keywords

Occurrence; Observation

Contacts

Sokhna Maimouna Seye
  • Originator
TROPICA
Dakar
SN
  • +221 78 168 27 72
Marc Lerquet
  • Metadata Provider ●
  • Point Of Contact
ARTELIA
69003 Lyon
Auvergne-Rhône-Alpes
FR
Robin CAMUS
  • Point Of Contact
Agence Français du Développement
DAKAR
SN
Oumar NGOM
  • Point Of Contact
SENELEC
Dakar
SN

Geographic Coverage

Les inventaires ont été réalisé dans la campagne sénégalaise, dans les régions de Thiès et Touba.

Bounding Coordinates South West [14.847, -16.757], North East [15.01, -15.793]

Taxonomic Coverage

The range of taxa is limited to avifauna

Kingdom Animalia

Temporal Coverage

Start Date / End Date 2025-09-24 / 2025-09-27

Project Data

En juin 2023, le Sénégal a lancé, en partenariat avec un groupe de partenaires internationaux (France, Allemagne, Royaume-Uni, Canada et Union européenne), une initiative ambitieuse baptisée Partenariat pour une Transition Énergétique Juste (JETP). Ce partenariat vise à soutenir l’accès universel à l’énergie tout en consolidant un système énergétique durable, résilient et à faible émission de carbone. Il prévoit un financement global de 2,5 milliards d’euros pour accompagner le pays dans sa transition énergétique. Dans ce cadre, le Sénégal s’est fixé pour objectif de porter la part des énergies renouvelables à 40 % de son mix énergétique (en capacité installée) d’ici 2030. Selon les simulations préliminaires de SENELEC, une capacité supplémentaire d’au moins 600 MWc est nécessaire pour atteindre cet objectif. Pour amorcer cette dynamique, une première phase de développement de 100 MWc est prévue. Elle comprend la construction de deux centrales hybrides photovoltaïques avec stockage par batteries (BESS), chacune d’une capacité de 50 MWc de solaire et 30 MW / 90 MWh de stockage. Ces centrales seront implantées dans la commune de Touba – Toul, région de Thiès et dans la commune de Déaly, située dans la région de Louga.

Title ETUDE D’IMPACT ENVIRONNEMENTAL ET SOCIAL POUR LA CONSTRUCTION DE LA CENTRALE PHOTOVOLTAÏQUE DE 50MWC A DÉALY COUPLEE A DES SYSTEMES DE STOCKAGE DE 30MW/90MWH
Funding Le projet est financé par l’Agence Française de Développement (AFD) et développé par le promoteur (SENELEC).

The personnel involved in the project:

Marc Lerquet
  • Content Provider

Sampling Methods

10 min fix observation points

Study Extent The site of the Touba-Toul solar power plant is located in the Thiès region, approximately 80 km east of Dakar. The site of the Dealy solar power plant is located in the Louga region, about 190 km northeast of Dakar.

Method step description:

  1. The data are collected from field notes and digitized in Excel at the end of the mission.

Additional Metadata

Acknowledgements
Purpose
Alternative Identifiers https://ipt.gbif.fr/resource?r=bird_inventory_thiestouba_senegal